Anthem to Plum Creek Waterline Project

Project Type:
Utility
Project Status: 
In Construction

This project includes the installation of approximately 6,500’ of 16” PVC waterline from the Plum Creek Subdivision east of CR 2770, along the North side of Hays Consolidate High School, and ultimately connecting to the Anthem Subdivision. 

Anthem to Kohlers Waterline
Anthem to Kohlers Waterline
Anthem to Kohlers Waterline
Status Updates

As of 7/2/24:

  • Concrete dome for tank floor support has been poured.
  • Washed rock subfloor for pedestal floor has been laid and concrete should be poured soon.
  • Concrete floors for storage should start by 7/1.
  • Hardware for tank stairs on site.